Engineering exports
Download wiring schedules, a bill of materials, and an interconnection package.
Engineering outputs become available after engineering setup.
Schedules and bill of materials
Use the editor’s Download menu:
| Download | Contents |
|---|---|
| DC String | A CSV string schedule. |
| AC Wiring | A CSV wire schedule. All AC equipment must be placed first. |
| BOM | A CSV bill of materials. |
Review string assignments and equipment placement before sharing these files. Changes to the layout or equipment can change the schedules.
Interconnection package
Use the interconnection package action in the engineering workspace to create a plan-set ZIP. It includes site-plan and single-line drawing files, with supporting information for the design.
The access dialog explains any seat or voucher requirement. Review it before confirming.
Check equipment settings, utility requirements, design notes, and placement before downloading. Review the generated drawings for the project’s requirements before submitting them.